TECHNICAL REQUIREMENTS | TECH RIDER 

YYY audiovisual performance by eraylik

Equipment Provided by the Artist

  • Audio:

    • 3 MIDI Controllers (Novation)

    • Multi-FX Processor (Line-6 HX)

    • Yamaha Drumpad

    • MIDI Keyboard (Axiom)

    • Guitar

    • Sound card : Apollo Twin X DUO 

    • MacBook Pro & Mac Mini (for sound and visuals processing)

  • Others

    • Genki Motion Sensor 

    • Set of drills 

    • Various cables

  • Software:

    • Ableton Live 

    • Max4Live

    • Arena Resolume 

Equipment Requested from the Festival

  • Projection & Visuals:

    • Minimum 1 high-resolution projector 

    • Projection screen or smooth light-colored wall

    • Optionally: Additional projectors (if multi-surface projection is possible)

  • Audio System:

    • 4-channel surround sound system

    • Subwoofers for low-frequency effects

    • On-site audio mixer for live sound integration

  • Lighting:

    • Stage lights or LED lighting system with adjustable brightness and colors

    • Minimal ambient light for optimal projection quality

  • Technical Infrastructure:

    • Stable electrical power supply with surge protection

    • Adequate power outlets (minimum 6 available near the setup area)

    • Extension cables and adapters


Space Requirements

  • Footprint Space: 5m x 5m 

  • Ceiling Height: Minimum 3m clearance

  • Projection Space:

    • Minimum: 4m (width) x 3m (height)

    • Maximum: 8m (width) x 6m (height)

    • Capable of handling single-wall or multi-wall projections

Setup and Support

  • Setup Time: 2-3 hours for full installation and testing

  • On-Site Support:

    • Technical crew for projector and sound system setup

Additional Notes

The performance integrates audio, visuals, and interactive motion technology. Flexibility in space and projection setup will enhance the immersive quality. All equipment and specifications can be adjusted based on the festival’s resources. A more detailed tech rider can be provided upon request.